All foundations abutted together
-
The various foundation slabs consist of a
plywood box which is 6 in thick/high as grade plus the slabs height
relative to grade. The lowest level is 6 in high or at
grade. The office is 2 in above grade. The main level is 4
in above grade. The garage is 3 1/2 in above grade.
|
 |
Foundation Bracing
-
Closeup of metal bracing for added
strength.
|
 |
Plywood Base
-
The plywood base is composed of 2 x 8
strips of 3/4 in plywood which is doweled together. It
disassembles fairly nicely is stable.
|
 |
Plywood Base
-
The base is not perfectly flat so my
foundation pieces are close but not perfectly aligned. I will
need to bolt them together.
|
 |
Drilling and Bolting Foundation
-
I needed perfect alignment of the
various foundation pieces. They are each balanced on 4 pieces of
the correct thickness pieces of wood so their bottoms would
align. They are then clamped for drilling
|
 |
Clamping
-
Firm clamping for drilling.
|
 |
Bolting in the upright position
-
I placed the foundation pieces on
blocks so I could bolt them together from below.
|
 |
Bolts
-
Closeup of bolts clamping each
foundation piece to one another.
|
 |
Foundation & Subfloors
-
Here is the assembled product. I
need two more subfloors for the lower level and office area.
|
 |
Foundation & Subfloors
-
See above. Now to create my
additional subfloors and start on walls and ceilings and eventually,
the second story and roof.
|